JEES Global
Service Hub · BOQ Procurement

BOQ-Based Procurement from China — Source Every Line Item, One Shipment

Submit your Bill of Quantities across any material category — structural, interior, MEP, hardware, or machinery — and get back one consolidated, line-item quotation mapped to your original document.

  • Multi-category quotation in one document
  • Line-item mapped to your BOQ
  • Pre-shipment inspection per category
  • Consolidated container shipment
project-boq-rev3.xlsx
Line
Description
Unit
Qty
Category
01.020
Structural steel columns, S355JR, hot-dip galvanized
t
48.5
Structural
02.110
Porcelain floor tiles, rectified, 600×600 mm
1,820
Interior
02.240
Aluminum sliding window, thermal break, double-glazed
nr
126
Interior
03.040
VRF outdoor unit, 22 HP, R410A
nr
14
MEP
03.180
PPR pipe, PN20, Ø32 mm, hot/cold water
m
2,460
MEP
04.010
Concrete mixer, self-loading, 3.5 m³
nr
2
Machinery
05.030
Stainless steel anchor bolts, M16 × 200, 304
nr
3,800
Hardware
Lines 1 – 7 of 214 Categories sorted
The Problem

Quoting a Multi-Trade BOQ Shouldn’t Mean 20 Separate Conversations

If you’ve ever priced a 200-line BOQ across a dozen trades, you already know where the time goes — chasing suppliers, normalizing quotations, and reformatting documents just to make them comparable.

20+ separate supplier conversations

A multi-trade BOQ usually means a dozen WeChat threads, half a dozen Alibaba inquiries, and no single party accountable for the document.

Inconsistent units and incomplete specs

Some lines are precise, others say 'as per drawing' with no drawing attached. Suppliers quote around the gaps and the prices stop being comparable.

Reformatting every quotation by hand

Each factory sends back its own template. The QS spends a day rebuilding line numbering before the BOQ can even be priced.

No single point of accountability

When a line is wrong, late, or missing on arrival, no one owns the document — only the line they quoted.

One BOQ, multiple shipments

Each supplier ships separately. Freight cost multiplies, customs filing multiplies, site handling multiplies.

Lost time, not lost money

The actual unit prices are usually fine. What kills a BOQ procurement cycle is the four weeks lost coordinating it.

The JEES Approach

One BOQ. One Coordinated Sourcing Process.

We review the full BOQ, sort every line into the right material category, route it to the matched factories already in our sourcing network, and return one quotation document using the same line numbering as the original file.

The line numbering is the detail that matters. The returned quotation drops back into your BOQ document at the same row references, so your QS workflow doesn’t change.

Same line numbering
Returned quotation maps row-for-row to your original BOQ.
Multi-category in one file
Structural, interior, MEP, hardware and machinery in one quotation.
Matched-factory routing
Each line goes to a factory already vetted for that product family.
Inspection per category
Pre-shipment QC per category, photo report against the BOQ line.
Consolidated shipment
All categories loaded into one container under a documented plan.
One set of export docs
Single invoice, packing list and BL for the consolidated cargo.
How It Works

One BOQ In. One Container Out.

Twelve steps from your submitted BOQ to delivered cargo at your destination port. The fan-out below shows where your document splits across factories and where it reconsolidates into a single shipment.

Your BOQ
One file in
StructuralInteriorMEPMachineryHardware
Consolidated
One container out

Your BOQ splits across the matched factories for each category, runs through its own production and QC track, then reconsolidates into a single packed container under one set of export documents.

  1. Step01

    Submit your BOQ

    Excel, PDF or Word — including exports from CostX, Buildsoft, Cubit or similar QS software. We accept the document as it is.

  2. Step02

    BOQ review & categorization

    Every line is read and sorted into the relevant material category — structural, interior, MEP, hardware, machinery.

  3. Step03

    Specification clarification

    Any line with missing or vague specs is flagged back to you before quoting. We never guess at a spec to keep a quotation looking complete.

  4. Step04

    Multi-factory quotation

    Matched factories in our existing sourcing network quote each line item or category group based on the agreed specifications.

  5. Step05

    Consolidated quotation returned

    One document, same line numbering as your BOQ — unit price, MOQ, lead time and incoterm against every line you submitted.

  6. Step06

    Review & approve

    Approve the full BOQ or selected lines only. You decide what moves to production and what stays open for further review.

  7. Step07

    Sample confirmation

    Where samples are needed — finishes, tiles, hardware, fabrics — we coordinate dispatch and sign-off before bulk production starts.

  8. Step08

    Production coordination

    Across every factory involved, production timelines are aligned so categories arrive at the consolidation warehouse in the right sequence.

  9. Step09

    Pre-shipment inspection per category

    Each category is inspected at its factory or at our consolidation warehouse before loading, with a photo report against the BOQ line.

  10. Step10

    Consolidated packing & loading

    Mixed-category goods are packed, labelled by BOQ line and loaded into one container under a documented loading plan.

  11. Step11

    Export documentation

    Commercial invoice, packing list, BL, certificate of origin and any fumigation or pre-shipment certificates required at your destination port.

  12. Step12

    Shipment & delivery

    FOB, CIF or DDP to your nominated port, with tracking and a single point of contact through to arrival.

Side by Side

Quoting Your BOQ Yourself vs BOQ Procurement with JEES

Quoting Your BOQ Yourself
BOQ Procurement with JEES
20+ separate supplier conversations
One submission, one process
Inconsistent quotation formats
One consolidated quotation document
No single point of accountability
One contact through to delivery
Manual reformatting to compare prices
Same line numbering as your BOQ
Separate shipments per supplier
One consolidated container
Multiple QC reports in different formats
One inspection log mapped to BOQ lines
JEES — BOQ Quotation Sample (redacted)
Line
Description
Unit ($)
Lead
MOQ
01.020
Steel column, S355JR, HDG
1,240
35 d
5 t
02.110
Porcelain tile, 600×600, rectified
6.40
25 d
300 m²
02.240
Aluminum sliding window, DG
138.00
30 d
20 nr
03.040
VRF outdoor, 22 HP, R410A
4,820
40 d
1 nr
03.180
PPR pipe, PN20, Ø32
0.92
20 d
500 m
04.010
Self-loading mixer, 3.5 m³
60 d
1 nr
05.030
Anchor bolt, M16×200, 304
0.46
18 d
1,000
Same numbering as submitted BOQ Ready to import
Download Sample Quotation
What You Get Back

See How a Returned BOQ Quotation Looks

A redacted sample of the document you receive — one consolidated quotation, with the same line numbering as your original BOQ. Unit price, MOQ and lead time against every line, in a format you can drop straight back into your QS tooling.

  • Same line numbers and section headings as your BOQ
  • Unit price in your currency, factory price and sourcing fee shown separately
  • MOQ and lead time per line, not per supplier
  • Open notes column for spec queries and alternatives
FAQs

BOQ Procurement from China — FAQs

Send Your BOQ

Send Your Bill of Quantities

Upload your BOQ in any format. We’ll review it, sort it by category, and return one consolidated quotation mapped to your original line numbering.

Looking for a single-category quote first? Browse the full materials list or jump straight to the general quote form.

Drop your BOQ here or click to browse
xlsx · pdf · docx · csv · max 20 MB
.xlsx.pdf.docx

We reply within 1 business day. Your BOQ stays confidential — NDA available on request.