JEES Global
Rooftop solar PV installation with monocrystalline panels and hybrid inverter at a commercial building
18Category Hub · Solar & Renewable Energy

Solar & Renewable Energy Supplier China for EPCs, Developers & Off-Grid Projects

Source Tier-1 solar panels, string and hybrid inverters, LiFePO4 storage, mounting and EV chargers from verified Chinese makers — with bankability, IEC certification, EL imaging and grid-code compliance handled before shipment.

  • Tier-1 Module Makers
  • Hybrid & String Inverters
  • Grade-A LiFePO4 Cells
  • EL Imaging Pre-Ship
The Buyer Challenge

Solar Looks Simple Until the Wrong Bin of Modules Arrives

Modules and inverters are commodities — but bankability, cell tier, grid code compliance and bankable warranty are not. The wrong call quietly costs more than the equipment ever did.

B-grade modules sold as A

Visually clean panels that fail EL imaging — micro-cracks invisible to the eye, real over 25 years.

Inverter without your grid code

String inverter that won't pass G99, AS 4777 or VDE — site never gets utility approval.

B-grade LiFePO4 cells

Cells sold as Grade-A but actually reject stock from Tier-1 makers — short cycle life, BMS issues.

Module-to-inverter mismatch

DC string voltage and MPPT windows that don't match the panel selection, capping output.

Power flash below nameplate

450 W rated panels measuring 5–8% below in flash test — the system underperforms from day one.

Glass cracked in transit

Pallets stacked wrong, no edge protection — modules arriving with broken glass before unloading.

How JEES Works

Solar Sourcing Built Around Bankability and Grid Code

We treat each system as a 25-year financial asset. Bankability, certifications, warranty path and grid code are confirmed before the PO opens, not after the inverter trips at commissioning.

Step 01

Read System BOM

Layout, string sizing, grid code, battery autonomy and EV scope mapped per project.

Step 02

Shortlist Bankable Makers

Tier-1 module list, bankable inverter brands and Grade-A cell makers compared per market.

Step 03

Verify Grid Code & EL

Inverter grid code certificate confirmed; modules EL-imaged and flash-tested per sample batch.

Step 04

Pack DG, Load & Ship

UN 38.3 battery packing, plywood module pallets, supervised loading, certificates and MSDS.

Product Categories

Renewable Energy Products We Can Help You Source

Generation & Conversion

Monocrystalline PERC Panels sourced from China by JEES GlobalMonocrystalline

Monocrystalline PERC Panels

450–550 W half-cell PERC modules with 30-year linear performance warranty from Tier-1 makers.

Best for utility & C&I rooftops
Request Quote
TOPCon & HJT Panels sourced from China by JEES GlobalTOPCon

TOPCon & HJT Panels

550–700 W TOPCon and HJT modules with higher efficiency and lower degradation curve.

Best for premium and constrained roofs
Request Quote
Bifacial Modules sourced from China by JEES GlobalBifacial

Bifacial Modules

Glass-glass bifacial panels for ground-mount and tracker systems with rear-side gain.

Best for utility-scale ground-mount
Request Quote
String Inverters sourced from China by JEES GlobalString

String Inverters

3 kW to 250 kW string inverters with country-specific grid codes pre-loaded.

Best for residential & C&I
Request Quote
Hybrid Inverters sourced from China by JEES GlobalHybrid

Hybrid Inverters

5–30 kW single and three-phase hybrid inverters with battery and EV-ready integration.

Best for self-consumption & off-grid
Request Quote
Central Inverters sourced from China by JEES GlobalCentral

Central Inverters

500 kW–3.4 MW central inverters and string-central solutions for utility-scale plants.

Best for utility-scale PV
Request Quote

Storage, Mounting & EV

Wall-Mount LiFePO4 sourced from China by JEES GlobalWall-Mount

Wall-Mount LiFePO4

5–15 kWh wall-mount residential storage with integrated BMS and inverter compatibility.

Best for homes & small commercial
Request Quote
Rack & Cabinet ESS sourced from China by JEES GlobalRack

Rack & Cabinet ESS

50–250 kWh rack and cabinet systems for C&I peak-shaving and back-up applications.

Best for C&I behind-the-meter
Request Quote
Containerised ESS sourced from China by JEES GlobalContainerised

Containerised ESS

500 kWh–5 MWh containerised LiFePO4 systems with fire suppression and HVAC for utility use.

Best for utility & microgrid
Request Quote
Mounting Structures sourced from China by JEES GlobalMounting

Mounting Structures

Rooftop rails, ground-mount frames, ballasted systems, carports and BIPV mounting.

Best for all PV installation types
Request Quote
AC & DC EV Chargers sourced from China by JEES GlobalAC

AC & DC EV Chargers

AC 7–22 kW wall-boxes and DC 30–360 kW fast chargers with CCS2, CHAdeMO and OCPP support.

Best for fleets, retail & public charging
Request Quote
BoS — Cabling & Combiner sourced from China by JEES GlobalBoS

BoS — Cabling & Combiner

DC solar cable, MC4 connectors, AC cabling, combiner and string boxes with surge protection.

Best for complete EPC packages
Request Quote
Custom Specifications

Configured Around Your Site Layout and Grid Code

Solar configurations live and die on small numbers — string voltage windows, MPPT count, grid code version, battery SoC limits. We commit each before the PO opens so the inverter doesn't trip at commissioning.

You can also explore our complete project quote workflow or learn more about JEES Global.

Send System BOM & Layout

Specification Checklist

14 Items
  • System size (kWp DC, kVA AC)
  • Application (residential / C&I / utility)
  • Site type (rooftop / ground-mount / carport)
  • Module technology (PERC / TOPCon / HJT / bifacial)
  • Panel wattage and quantity
  • Inverter type (string / hybrid / central)
  • Country grid code (G99 / AS 4777 / VDE / IEEE)
  • Battery capacity and autonomy
  • BMS and fire-suppression spec
  • Mounting type and roof material
  • EV charger scope and connectors
  • DC and AC cabling schedule
  • Combiner box and string count
  • Destination market & certifications
Factory Coordination

Module, Inverter, Battery and Mounting — Matched Before the PO Opens

PV is a system, not a parts list. Module strings, MPPT windows, inverter grid code, battery DC voltage and mount type all have to agree — we lock the compatibility before a single carton is built.

One Factory Alone
JEES Coordination
Panels picked on price per W alone
Tier-1 module list verified against bankability requirement
Inverter grid code assumed
Country grid code certificate confirmed before PO
Battery cell grade taken on the label
Grade-A LiFePO4 cell reference verified per cell maker
Mounting bought separately from a trader
Mounting sized to roof type and wind / snow zone
EPC chases multiple suppliers for one project
Module, inverter, battery and BoS consolidated under one PO
Quality Inspection

EL Imaging, Flash and Grid-Code — Verified Before Pallet Wrap

Module micro-cracks and inverter grid-code mismatches are the two failure modes that quietly destroy project IRR. We check both at the factory before the cartons close.

Inspect
Document
Approve

Pre-Shipment Inspection Checklist

  • EL imaging on sample module batch
  • Power flash test against nameplate Wp
  • Frame and junction box inspection
  • Inverter grid code certificate verification
  • BMS firmware and protocol check on batteries
  • Cell grade reference verification
  • Mounting structure dimensional check
  • Carton, pallet and corner protection check

Inspection & Loading Photo Reports

Photo
EL Imaging Photo
Photo
Flash Test Result
Photo
Cell Reference Photo
Photo
Grid Code Cert
Photo
Pallet Loading Photo

Real inspection and loading photos are shared with every shipment. Placeholders shown for illustration.

Export & Shipping

From Module Pallet to Your Project Site

Solar shipments mix fragile glass-faced modules with dangerous-goods batteries and structural mounting. Each has its own packing and documentation discipline — we handle all three under one shipping plan.

01

Pack by Discipline

Modules on plywood pallets with corner protection, batteries to UN 38.3 DG packing, mounting banded.

02

Prepare Documents

IEC and grid code certificates, MSDS, UN 38.3 reports, bankability letters and certificate of origin.

03

Load & Ship

FOB, CIF or CFR with DG handling, supervised container loading and seal photos.

Why JEES

Why EPCs and Developers Bring Us Into the Solar Scope

Project finance teams don't accept generic catalogues. We come in because we treat bankability, grid code and warranty as project conditions, not marketing claims.

Talk to our sourcing team
  • Tier-1 module bankability verified
  • Inverter grid code certificate confirmed
  • Grade-A LiFePO4 cell reference verified
  • EL imaging and flash-test pre-shipment
  • UN 38.3 DG handling on battery shipments
  • Mounting sized to wind and snow zone
  • EV chargers OCPP-compliant for backend
  • Module + inverter + battery + BoS in one PO
Trust & Proof

Bankable Evidence You Can Share With the Project Financier

EL images, flash reports, grid-code certificates, cell references and UN 38.3 documents — gathered into one project file so the lender's technical advisor signs off the shipment, not the brochure.

Module Master Photos
Modules

Module Master Photos

Sample modules photographed with nameplate, wattage and Tier-1 reference.

EL Imaging Reports
EL

EL Imaging Reports

Electroluminescence images on sample batch with micro-crack analysis.

Flash Test Logs
Flash

Flash Test Logs

Power flash test results recorded against nameplate Wp per pallet.

Inverter Grid Code Cert
Grid Code

Inverter Grid Code Cert

Country grid code certificate for the inverter model confirmed and photographed.

Cell Grade Reference
Cells

Cell Grade Reference

LiFePO4 cell brand and Grade-A reference photographed inside the battery module.

Pallet & DG Pack
Pack

Pallet & DG Pack

Module pallets, corner protection and UN 38.3 battery packing photographed pre-load.

IEC & UN 38.3 Docs
Certs

IEC & UN 38.3 Docs

IEC 61215, IEC 62109, IEC 62619 and UN 38.3 documents collected per shipment.

Final QC Report
QC

Final QC Report

Pre-shipment QC report with EL, flash, grid-code and DG handling per batch.

We don't publish fake badges or stock photos. Real proof — sample, inspection, packaging and loading photos — is shared per order to your team and procurement records.

Prepare Your Quote

What Gets a Solar Quote Moving

A system BOM or a one-line diagram is enough to start. We come back with shortlisted bankable makers, grid-code-matched inverters and a clean per-component quotation.

Send System BOM
  • System BOM
  • Single-line diagram
  • Module preference
  • Grid code / country
  • Battery autonomy
  • EV charger scope
  • BoS scope
  • Destination port

Solar & Renewable Energy Product Catalogue 2026

Specs, material grades, surface treatments & project checklist

PDF · Free · Instant delivery
FAQ

Solar & Renewable Sourcing — Buyer Questions

Start Sourcing

Send Your Solar Scope for Pricing

Share the system BOM, layout and grid code. We come back with shortlisted bankable makers, sample plans and a clean per-component quotation.

  • Reply within 1 business day
  • NDA available on request
  • Free sourcing consultation

What to Include in Your Inquiry

  • Company & contact details
  • Country / destination port
  • Project type (residential / C&I / utility)
  • System size (kWp / kWh)
  • Module and inverter preference
  • Grid code or off-grid setup
  • Battery and EV scope
  • Required certifications

Prefer to talk first? Visit our contact page or browse how JEES Global works.